Page 986 - ΔΟΚΙΜΗ

Basic HTML Version

940
ΕΠΙΣΗΜΗ ΕΦΗΜΕΡΙΔΑ ΠΙΣ ΙΟης ΑΥΓΟΥΣΤΟΥ
1984
Part C - Extension Staff
Strengthening of the sheep and goat extension service through the
provision of additional staff, visuaJ aid material, about 5 vehicles, office
suρρlies
and the
ρrovision
of one (small) computer for the processing of the various
surveys to be conducted under the Project.
Part
Ο
- The provision of Technical Assistance in mi1k marketing and dairy
technology; Halloumi cheese content testing methods and standards; livestock
and meat marketing;milk and dairy products marketing; CMIO organisation
and management.
~u.!'t Ε
- The establishment and operation of a monitoring and evaluation system
for the Pro ject.
2.
The Project is expected
Ιο
be completed by 30 September 1989.
SCHEDULE 2
Allocation and
ννί
thdrawal
of Loan Proceeds
1.
The table below sets forth the categories of goods, services and other
items to be financed
οuΙ
of the proceeds of the Loan, allocation of the amounts
of the Loan
Ιο
each category and the percentages of expenditures for items
to be financed in each category:
Amount of the
Loan Allocated
0;0 of
(Expressed in
Expendi tures
Category
SDR Eguivalent)
Ιο
be F inanced
Ι.
Civil Works (milk
190,000
60% of totaJ
collecting and
expendi tures
cooling centres)
Π.
Vehicles, equipment
1,040,000
1000;0 of foreign
and furni ture
expenditures; 90%
of locall
Υ
procured
but
imported~ aπd
800;n (ex-factory) of
locall
Υ ρrocured
and pro duc ed
.~
.
Credi t for shed
2,470,000
500;0 of amounts
. JI
constructi.on/
disbursed. by CCB
imρro
vement
ιν.
Technical Assistance
190,000
1000;0 of foreign
expenditures for
consultants outside
Cyprus and
900;0 for other
consultants
ν.
Incremental Operat-
380,000
300;0 of total
ing costs
expenditures
νι
UnalJ oca ted
380,000
ΤΟΤΑL
4,650,000