Part F:
Central Control System
Establishιnent
and initial operation of a central control
system with telemetric transmission for the monitoring and con–
trol of water levels and water production, as well as the alloca–
tion and distribution of water resources under the Project and
under the VPP.
Part
G:
Institutional Restructuring; Preparatory Engineering
ι
Work
1.
Carrying out of a study under terms of reference acceptable
to the Bank
t
to. review the exis ting organization and managetnent
of the Borrower's water resources and to determine and recomn.end
the appropriate structure for an entity (the ' 'Entity' ') to be
responsible for the development, management and allocation of
sa1d resources.
2.
Preparatory engineering work for development of the Second
Phase of the Southern Conveyor Scheme for Water Resources
Development.
3.
Carryiog out studies, under terms Qf refereoce acceptable to
the Bank, to determine the measures
"be taken
ίο
the event of
water shortages following completion of the Southern Conveyor
Scheme for Water Resources Development.
Part
Η:
Bu11dings and Equ1pment
Refurbishing
οί
existing build1ngs to be used
θβ
off1ces and
workshops by Project staff dur1ng the construction and operat1on
of the Projec
t,
and provls1on of vehlcles and offlce equlpment
for use by sa1d staff.
*
*
*
The Project 1s expected to be completed by December
31, 1989.