Page 393 - untitled

Basic HTML Version

390
RAILWAYS, CANALS,
Terminal Stations of each Line.
Whether con–
structed, owned,
or worked by
GoTernment, or by
prirate body.
Length open for
traffic.
Gauge of Railway
or
width of Canal.
Total
cost of construction
and maintenance
up to date.
R A I L W A Y S .
Famagusta—Kalon chorion
CANALS (for traffic).
ROADS & BRIDGES.
Nicosia to Larnaca
Nicosia to Deftera—
Palaeokhorio Road
Nicosia to Varoshia
»
Limassol
„ „ Trikomo
Branch. Road •
Trikomo Boghaz Road
Nicosia via Peristerona to Morphou
Morphou—Karavostasi Road
Nicosia to Kyrenia
Nicosia—Dikomo Loop Road
Larnaca to Mari River via Zygi
Zygi to Limassol Main Road
i
Larnaca to Famagusta old Road
to Lefkonik o
Larnaca to Kophino
Kophino „ Letkara
Kato Lefkara Branch Koud
Khirokitia to Ora
Government
Government
n
D
11
71
NONE
Miles.
26
18
38
54
33
2*
3
24
11
16
8
24
233
26
26
Not repaired
by Govern
ment now.
15i
H
13
2' 6"
£ s. cp.
Construction cost
157,079 17 7
t
t
43,353
6,172
17,046
35,787
15,296
31
933
8,045
4,593
12,026
86
7,140
729
9
15
15
13
2
10
3
7
0
2
15
12
9
1
4
2
5
7
1
3
r+
0
7
8
6
1
4
1,138 14 6
15,164 18 6
11,298 14 6
1,284 19 7
292 2 3
2,060 9 3
* These figures include original coat and sums subsequently spent on maintenance and construction of bridges.
f Repairs only.