Page 386 - untitled

Basic HTML Version

382
1
1
i
Terminal Stations of each Line.
RAILWAYS.
Famagusta—Morphou
CANALS (for traffic).
«
R O A D S & BRIDGES.
Nicosia to Larnaca
Nicosia to Deftera—
Palaeokhorio Road
Nicosia to Varoshia
,, „ Limassoi
„ „ Trikomo
Marathovouno Branch Road
Trikomo Boghaz Road
Nicosia via Peristerona to Morphou
Morpiiou—Karavostasi Road
Nicosia to Kvrenia
Nicosia—Dikomo Loop Road
Larnaca to Mari reiver via Zygi
Zygi ro Limassoi Main Koad
Larnaca to Famagusca old Road
„ Central Mesaoria Road
to Lefkoniko
Larnaca to Kophiuo -
Kophino „ Letkara
Kato Lefkara Branch Road
Khirokitia to Ora
Whether con–
structed, owned,
or worked 07
Gorernment. or by
prirate body.
Government
Government
n
it
•»
»-
"
"
,
1
1
M
'
"
/ Not repaired
> by G-overn-
\ menc now.
Lenjjth open for
traffic.
61
N O N E
Miles.
26
18
38
54
33
2i
3
25
11
16
8
24
233
26
26
15*
«4
li
13
RAILWAYS, CANALS,
Gauge of Rail-ray
or
width of Canal.
2' 6"
Total
cost of construction
aud maintenance
ap to date.
£ s
%
c.p.
Construction cost
127,468 11
38,448 18
5,389 17
15,333 4
28,838 11
14,293 19
f 31 10
834 17
7,271 10
3,368 3
10,237 1
t 86 15
1
7,140 12
1
558 1
1,138 14
13,386 17
8,766 1
1,284 19
292 2
2,060 9
1
t
3
\
3
8
,
* !
8 t
2 1
r
1 r
r
1
6
2
6
6
1 i
8
6
8
8
1
7
3
3
1
:
These figured include
origiuai
coat and audi*
subsequently
spent on maintenance and construction of bridges.
t Repairs 00I7.