Page 391 - untitled

Basic HTML Version

386 ]
RAIL WAYS. CANALS,
Terminal St.itior.s of each Line.
Whether con–
structed, owned.
or worked bv
Government, or by
Drivate bodv.
Length open for
traffic.
Gauge of Raihvav
or
width of Canal.
Total
cost of construction
up to date.
RAILWAYS.
Famagusca—Morphou
CANALS (for traffic).
ROADS & BRIDGES.
Nicosia to Larnaca
Nicosia
Nicosia
to
to
Deftera—
Paleokhorio Road
Varoshia
„ „ Limassoi
„ „ Tricomo
Marathovouno Branch Road
(Repairs only)
Tricomo Bougaz Road
Nicosia via Peristerona to Morphou
Morphou -Karavastasi Road
Nicosia to Kvrenia
Nicosia—Dicomo Loop Road
Larnaca to Mari River via Zivi
•J
Zivi to Limassoi Main
Road
„ to Famagusta old Road
Central Mesaoria Road
to Lefkoniko
Larnaca to Kophinou
Kophinou „ Lelkara
Kato Lefkara Branch Road
Khirokitia to Ora
Government
Government
:J
TJ
JJ
JJ
JJ
61
N O N E
Miles.
26
18
33
54
33
oi
-i
3
25
11
16
8
24
233
26
26
loi
n
13
2' 6
V
s. c.p.
110.968 0 0
30,600
3,826
13,518
1S,547
12,205
f30
72
6,544
1,620
S,4S5
|76
6,261
7
19
S
10
11
19
12
<->
o
19
1
15
19
0
4
S
3
0
2
7
mr
0
4
S
6
3
21s i;
1.13S 14 6
9,956 5 3
5,293 8 2
1,175 5 6
292 2 3
2,044 IS 5
The«e figures include original
colt and
sum*-' subsequently spent
on maintenance and construction of bridge.-
t Repairs only.