Page 948 - ΔΟΚΙΜΗ

Basic HTML Version

902
ΕΠΙΣΗΜΗ ΕΦΗΜΕΡΙΔΑ ΤΗΣ 2ας ΑΥΓΟΎΣΤΟΥ
1984
SCHEOOLK 2
Descrlptlon of the Project
The object1ves of the Project are: (1) to e11m1nate poten–
tlal health hazards
the L1massol-Amathus area and to prevent
contamlnat1on of the groundwater
8υρρΙΥ 1η
sald area; (11)
ιο
e11m1nate 1nterm1ttent floodlng wh1ch occurs dur1ng the ra1ny
season, thereby allow1ng commerclal, lndustrlal and other actlvt–
tles to cont1nue un1nterrupted; and (111) to cont r1bute to the
rationallzatlon of water resources
ιnana.$eιnent
by provld1ng the
potentlal for the recycl1ng of treated sewage effluent for 1rrl–
gat10n purposes. The Project compr1ses the flrst stage
a two–
stage development of the sewerage system
Llmas801-Amathus.
The Project cons1sts of the followlng Parts:
Part
Α:
Sewerage Collectlon and Treatment System
1.
(a) Construct1on of: (1) a sewage collect10n system, com–
pr1s1ng about 67 k110meters of laterals and ma1n sewers, together
wlth serv1ce connect1ons and necessary appurtenances; (2) a maln
lnterceptor compr1s1ng about 20 kl10meters of sewer p1pe and five
sewage 11ft stat1ons; (3) a
ιna1η
sewage pumplng statlon wlth
8
capac1ty of about 28,000 cub1c meters per day w1th
θΩ
emergency
overflow lnto Akrotlr1 Bay and about 9 k110meters of force ma1n;
(4)
θΩ
extended aeratlon sewage t reatment plant of a slze ade–
quate
ιο
take a dal1y average 1nflow of 28,000 cuhtc meters per
day; and (5)
θΩ
ocean outfall
1ηιο
Ep1skopl Bay; and (b)
carrΥΙng
out a study
οη
ocean outfall
sewa~e
dispersion.
2.
Provls1on of operatlng and malntenance equipment for the
sewerage collect1on and treatment system refecred
ιο 1η
Part
Α.Ι.
Part
Β:
Storm Dra1nage System
1.
Construct1on of a stOt"111 dra1nage system cons1stlng of: one
kl10meter of open-channel and dlversion weir
ιο
dlvert the Pole–
mldhla River
1ηιο
the Garyll1s R1ver; canal1zat10n of the Zakakl
Creek lnto the Akrotlrl Salt Lake
order to service the
we~tern
area of
L1ιnassol
and the Limassol Industrial Estate; about
10
kilometers of storm drains; and add1tlonal works to 1mprove the
ex1stlng stormwatec dra1nage system.
2.
Ριον1β10η
of
operatirιg
and
ma1nterιance
equ1pment for the
8torm dra1nage system referred to
Part
Β.Ι.
Part C:
Tra1n1ng
Train1ng of the Borrower' s personnel
the operatlon and
ma1ntenance of the sewerage system to be
corι8tructed
under the
Project.
*
*
*
The Project 18 expected to be completed by December
31,
1989.