ΕΠΙΣΗΜΗ ΕΦΗΜΕΡΙΔΑ ΤΗΣ 17ης ΙΟΥΛΙΟΥ
1984
Sect10n
4.04.
(a) The Borrower sh&ll:
(1) carry out stud1es for purposes
οί
determin1ng the
appropr1ate level
οί
charges for Project Water
and. not later than December 31. 1988. or ' such
later date as the Barik
may
agree. furn1sh to the
Bank for 1ts rev1ew and comment a proposed sched–
ule of charges for Project Water based
οη
the
results
οί
such studies;
(i1) starting w1th the year
ίη
wh1ch water
made
ava11able under the Project (f1rst ··year
οί
opera–
tion). establ1sh charges for Project Water, wh1ch
shal1 apply equally to surface water and ground–
water, at levels suff1c1ent to recover the
we1ghted average of the full un1t cost
οί
ground–
water and of a percentage of the un1 t cost
οί
surface water. wh1ch percentage shal1 be:
(Α)
for the f1rst year of operation not less than
45%;
(Β)
for the second year of operat10n not less than
55%;
(C) for the th1rd year of operat10n not less
than
65%;
and (D) for each year thereafter not
less than
65%.
(b) The Borrower shall:
(1) carry out stud1es for purposes of determin1ng the
appropr1ate level of charges for water made
available under:
(1) Operat10nal Irr1gation
Schemes; and (11) Pr10r Irr1gation Projects; and
not later than December
31, 1984,
or such later
date as the Bank may agree. furn1sh to the Bank
for its rev1ew and comment a proposed schedule of
charges for such water based
οη
the results
οί
such stud1es;
(11) estab11sh charges for water made available under
Operat1onal Irrigat10n Schemes at levels suffi–
cient to recover a percentage of the we1ghted
average un1t cost of ··.the water made ava11able
under such Schemes, whtch percentage shal1 be:
(Α)
for fiscal year
19&4
not less than 28%;
(Β)
for
fiscal year
1985
not less than
35%;
and (C) for
each year thereafter not less than
40%;
(111) starting with the year
wh1ch water is made
ava11able (first year
οί
operation) under each of
the Prior Irrigation Projects. respectively,
establish charges for the water made ava11able
the area covered by the respect1ve Project at
levels suff1c1ent to recover a percentage of the
we1ghted average un1t cost of watet made available
under such Project. which percentage shall be:
(Α)
for each year start1ng w1th the first year of
operat10n unt11 the s1xth year of operat1on not
less than
30%. 40%, 45%, 50%. 60%
and
65%
respect-
1vely; and
(Β)
for each year thereafter not less
than
65%.
(c) For purposes of this Section: (i) the term "un1t cost"
means fu11 operation and maintenance costs together with cap1tal