Page 309 - untitled

Basic HTML Version

294
THE CYPRUS GAZETTE, 4TH AUGUST, i960.
Name of Street : Paparrigopoulos.
Total length of frontage : 2,014 feet run.
Total estimated cost of work : £1,000.000 mils.
Description of work to be done : Construction of side ditches, formation of existing foundation, asphalting and
head expenses.
1 2 3 4*5 6
Name of owners to contribute
Plot
No.
Proportion
of total
to be paid
Estimated
cost of
work
Unexpended
sum of
money depo–
sited under
section 6
of the Law
Estimated net contribution
ia)
Cash
(*)
By way of
Annuity:
11 equal
annual instal–
ments of:
Chrystalla N. Katsouri ..
Miria A. Moustaka
Kasandra K. Haralambous
Elenitsa Ch. Vracha
Ioanna Michael Stavrides
Feriha M . Sami
Haralambos Gr. Katsellis
Ahmed Essad Omer
Salih M . Kanat
Costas S. Kiradjis
Kypros Haralambous
Annika St. Thrasivoulou
Haralambos Gr. Katsellis
Christoforos Ktorides ..
£ Maritsa Hobson
i Kenneth Hobson
Klitos Ktorides ..
Grigoris Ghalazeri
Margarita S. Hj. Constanti
Rodou Costa Hj. Toghli
\
Do.
Angeliki Yeorgadji Hj. Nicola
Totals ..
}
239
238
237
236
235
334
247
248
249
240
241
242
243
244
245
246
290
289
287
286
285
82/2014
72/2014
70/2014
69/2014
70/2014
128/2014
122/2014
250/2014
158/2014
130/2014
70/2014
72/2014
69/2014
72/2014
75/2014
81/2014
110/2014
95/2014
22/2014
60/2014
137/2014 1
2014/2014
£ mils
40.715
35.750
34.756
34.260
34.756
63.555
60.576
124.132
78.451
64.548
34.756
35.750
34.260
35.750
37.240
40.219
54.618
47.170
10.923
29.792
68.023 |
1,000.000
£ mils
£ mils
40.715
35.750
34.756
34.260
34.756
63.555
60.576
124.132
78.451
64.548
34.756
35.750
34.260
35.750
37.240
40.219
54.618
47.170
10.923
29.792
68.023
1,000.000
£ mils
4.648
4.080
3.967
3.911
3.967
7.255
6.914
14.170
8.955
7.368
3.967
4.080
3.910
4.080
4.251
4.591
6.235
5.384
1.245
3.401
7.764
114.143
Name of Street : Praxandros (Part).
Total length of frontage : 2,170 feet run.
Total estimated cost of work : £2,000.000 mils.
Description of work to be done : Excavation, filling, levelling, foundation, construction of culverts and side d
asphalting and overhead expenses.
Name of owners to contribute
Plot
No.
Proportion
of total
to be paid
Estimated
cost of
work
Unexpended
sum of
money depo–
sited under
section 6
of the Law.
Estimated net contributioi
ia)
Cash
ib)
By way of
Annuity:
11 equal
annual instal–
ments of:
Howard Thomas Ryton Dray
Mrs. Violet McCormack
Mrs. Ersi Batram Humfrey
Corman Robert Stephen Joly
£ Daniel Rossides
A Evgenios Rossides
Mery S. Romanos
Mrs. Gertrude Bolton ..
Eleni Costa Catselli
l Yiannakis Karefillides
£ Elli Yian. Karefillides
Eleni Georghiou Theodorou
Kallistheni Hi. Yiangou
\ Ioannis S. Yiangou
| Eliada I. Yiangou
Socratis Polycarpou
Anastasia H. Tsiripillou
Georghios Chrysanthou
Haritini N. Christofides
Athanasia A. Ragouzeou
Costas A. Ragouzeou
Demetrios A. Ragouzeou
Spyros A. Ragouzeou ..
Costas A. Ragouzeou
Totals ..
}
}
}
1
103
102
101
100
99
103
25
26
37
38
40
39
51
270
271
272
310
311
312
313
314
= =
1
255/2170 |
143/2170
183/2170
188/2170
188/2170
134/2170
50/2170
162/2170
70/2170
72/2170
8/2170
60/2170
87/2170
68/2170
70/2170
72/2170
72/2170
72/2170
72/2170
722170
72/2170
i
2170/2170
_.
£ mils 1 £ mils 1
235.023
131.797
168.663
173.271
173.271
123.502
46.083
149.309
64.516
66.360
7.373
55.300
80.184
62.672
64.516
66.360
66.360
66.360
66.360
66.360
66.360 I
2,000.000
.
£ mils 1
235.023
131.797
168.663
173.271
173.271
123.502
46.083
149.309
64.516
66.360
7.373
55.300
80.184
62.672
64.516
66.360
66.360
66.360
66.360
66.360
66.360 |
2,000.000
(A
£ mils
26.827
15.044
19.253
19.780
19.780
14.100
5.260
17.043
7.364
7.575
0.840
6.310
9.153
7.154
7.364
7.575
7.575
7.575
7.575
7.575
7.575
228.297
LI. 23/59/83.)