THE CYPRUS GAZETTE, aisx JULY, i960.
265
N a m e of Street : Kreon (second part).
Description of work (general detail) : Earthwork, foundation, premix, curb, levelling, ditches und overhead expenses.
Total estimated cost of work : 285.346 mils.
Total length of frontage : 373 feet.
1
IA
2 3 4 5
N a m e of owners to contribute
Plot
No.
Proportion
of total
to be paid
Estimated
cost of
work
Unexpended
sum of
money depo–
sited under
section 6
of the Law.
Estimated net contribution
ia)
Cash
ib)
By way of
Annuity:
11 equal
annual instal–
ments of:
Sawas I. Demades
Michalakis Nicola Koumenides
Soterios Haral. Ierodiaconou
Lena Michael I. Michaelidou .
Totals
57
58
98
99
100/373
93/373
91/373
89/373
373
£ mils
76.500
71.145
69.615
68.086
285.346
£ mils
£ mils
76.500
71.145
69.615
68.086
285.346
£ mils
9.453
8.791
8.603
8.413
35.260
N a m e of Street : I. Typaldos (second part).
Description of work (general detail) : Earthwork, foundation, premix, curb, levelling, ditches and overhead expenses.
Total estimated cost of work : £508.857 mils.
Total length of frontage : 776 feet.
1
Name of owners to contribute
15/72 Akis Ierodiaconou
19/72 Nicos Stylianou Theofanides
19/72 Panayiotis Stvlianou Theofanides
19/72 Kypros Stylianou Theofanides
Soteris Haral. Ierodiaconou
Do.
Do.
Do.
Totals
lA
Plot
No.
1
1
f68
J
95
96
101
100
2
Proportion
of total
to be paid
413/776
90/776
91/776
90/776
92/776
776
3
Estimated
cost of
work
£ mils
270.822
59.017
59.673
59.017
60.328
508.857
4
Unexpended
sum of
money depo–
sited under
section 6
of the Law.
£ mils |
5
Estimated net contribution
ia)
Cash
£ mils
270.822
59.017
59.673
59.017
60.328
508.857
ib)
By way of
Annuity:
11 equal
annual instal–
ments of:
£ mils
33.465
7.293
7.373
7.293
7.455
62.879
N a m e of Street : Mycenae.
Description of work (general detail) : Earthwork, widening of foundation, premix, curb, extension of culvert, levelling,
ditches and overhead expenses.
Total estimated cost of work : £372.086 mils.
Total length of frontage : 1,239 feet.
1
Name of owners to contribute
Sawas Pissarides
Michalakis L. Nicolaides
Thalia M . Papapetrou
Chrystalleni Solomonidou
Ianthi Georghiou Loizou
The Electricity Authority of Cyprus ..
Do.
Do.
Lilli A. Louca
Katina Antoniou Louca
Haralambos Demetriou Iatros
Zoe Sawa Karnapa
Constantinos Panayi Georghiades
Koulla A. Demetriou
Do.
Totals
IA
K
Plot
No.
132/5
418
417
416
415
' 414
413
412
590
591
405
401
400
398
132/6
;
2
Proportion
of total
to be paid
89/1239
78/1239
77/1239
77/1239
80/1239
80/1239
80/1239
83/1239
100/1239
87.5/1239
81.5/1239
128/1239
98/1239
18/1239
82/1239
1239/1239
3
Estimated
cost of
work
£ mils
26.728
23.424
23.124 |
23.124
24.025
24.025
24.025
24.926
30.031
26.277
24.475
38.440
29.430
5.407
24.625
372.086
4
Unexpended
sum of
money depo–
sited under
section 6
of the Law
£ mils
i
Estimated net contribution
ia)
Cash
£ mils
26.728
23.424
23.124 |
23.124
24.025
24.025
24.025
24.926
30.031
26.277
24.475
38.440
29.430
5.407
24.625
372.086 '
ib)
By way of
Annuity:
11 equal
annual instal–
ments of:
£ mils
3.303
2.895
2.857
2.857
2.969
2.969
2.969
3.080
3.711
3.247
3.023
4.750
3.638
0.668
3.043
45.979