Page 398 - untitled

Basic HTML Version

395
ROADS and TELEGRAPHS.
Annual charge
for interest, if
any.
In the case of Railways.
Passenger
Receipts.
Gooda
Receipts.
Total Receipts.
Total Expenditure
(excluding; any
charge for interest.)
Number
Telegraph Messages
sent.
3* miles open for mule traffic, remainder nothing done.
2* miles formed, 1•£ miles foundationed and 6 culverts. Remainder Village work but open
for wheeled traffic throughout. Completed as 3rd Class Road. 2* miles foundationed.
Opened 16 ft. wide right through. Metalled at Lefkoniko and foundationed almost throughout.
Good Carriage Road foundationed, metalled and bridged.
All opened for carriage traffic to full width 3rd class road bridged and mostly foundationed ;
included in Mamonia Valley Road to Mandria.
6 miles Cart Road and 7 miles bridle road open.
4th Class Cart Road foundationed and partly metalled.
Included in Ktima-Poli Road.
Bridle path open throughout for mule traffic
Good Carriage Road. Foundationed throughout and metalled.
Good Carriage Road. Has reverted to Village Road since Railway Extension.
Good Carriage Road. Foundationed throughout but not metalled.
Good Carriage Road. 3rd class road, bridged, foundationed and metalled.
Cart Road included in Chada-Syinou-Loukrounou Road. 3-^ miles foundationed.
Open for carts throughout. Connected with Limassoi District Roads' at Prodromos.
Work of widening approaching completion. Completed, and 5 miles foundationed.
includes some bridges and culverts. 1| miles of 13 ft. branches to Agros and Kyperounda
included in cost but not in distance given.
Opened 16ft. right through and bridged but unmetalled.
Opened for cart traffic throughout infineweather. 3* miles foundationed.
Good Carriage Road. Included in Limassol-Troodos'Road.
Good Carriage Road. Partly foundationed and metalled.
Bridle Village Road.
£15,612
£4.762
95.792
£220
4.515
51 A