Page 393 - untitled

Basic HTML Version

390
RAILWAYS, CANALS,
Terminal Stations of each Line.
"•Whether con–
structed, owned,
or worked by
Government, or by
private body.
Length open for
traffic.
Gauge of Railway
or
width of Canal
Total
cost of construction
aud maintenance
up to date.
I
RAILWAYS.
Famagusta Harbour—Evrykhou
CANALS (for traffic).
ROADS & BRIDGES.
Nicosia to Larnaca
Nicosia to Deftera—
Paheokhorio—Papoutza Pass
Nicosia to Varosha
„ ,, Limassoi
„ ,. Trikomo
Marathovouuo Branch Road
Trikomo Boghaz Road
Nicosia ria Peristeroua to Morphou
Morphou—Karavostasi Road
Nicosia to Kyrenia
Nicosia—Dikomo Loop Road
Larnaca to Mari River via Zyyi
Zwi to Limassoi Main Road
Larnaca to Famagusta old Road
to Lefkouiko
Larnaca to Kophino
Kophino ,, Lelkara
Kato Lefkara Branch Road
Khirokitia to Ura
Miles.
Government ! 76
N O N E
Government
.1
;>
- u
i*
M
:•
:,
ji
••
>l
26
32
38
" . 54
33
3
24
11
16
8
)!
Not repaired
by Govern–
ment now.
24
2-33
2(5
26
lol
3
v D
±.
s. cp.
Construction cost
166.263 0 2
t
49,367 2 4
10,390 3 5
19,592 14 1
44.830 0 1
17,314 12 3
31 10
933 3
8.308
5,229
14.354
o
4
5
t
86 15
1
3
8
1
1
6
7,140 12 1
1.047 9 4
1,138 14 6
18,377 1 4
13,506 7 5
1,284 19 7
292 2 3
2,060 9 3
These figures include original cost and sums subsequently spent on maintenance and construction of bridges.
t Repairs only.