Page 400 - untitled

Basic HTML Version

395
ROADS and TELEGRAPHS.
Annoal charge
for interest, if
any.
In the case of Railways.
Passenger
Receipts.
Goods
Receipu.
Total Receipts.
Total Expenditure
(excluding any
charge for interest.)
Number of
Telegraph Messages
sent.
3J miles open for mule traffic, remainder nothing done
Opened 16 ft. wide right through. Metalled at Lefkoniko partly foundationed.
Good Carriage Road foundationed, metalled and bridged.
All opened for* carriage traffic to full width 3rd class road included in Mamonia Valley
Road to Mandria.
6 miles Cart Road and 7 miles bridle road open.
14 ft. Carriage Road.
Bridle path open throughout for mule traffic.
Good Carriage Road. Foundationed throughout and metalled.
Good Carriage Road.
Good Carriage Road.
Opened Carriage Road, to Khalassa Bridge and thence to the 12th milestone on the
Troodos Road but not completed. A large Bridge built over Zighos River cost
: £1,106 lis. Sep. in addition to cost of Road work and the Lophos Bridge widened to 16ft.
Open for carts throughout. Rarts only 12 ft. wide. Connected wich Limassoi District
Roads at Prodromos.
Includes some bridges and culverts. If miles of 13 ft. branches to Agros and Kyperounda
iasluded in cost but not in distance given.
0jiea*d 16ft. right through and bridged but uumetalled." •"- :
Opened for cart traffic right through 4th class Road.
Opened for cart traffic throughout, see Lefka—Prodromos Road.
£12,013
£4,422
79,322
£99
2,256
51 A