ROADS' and TELEGRAPHS.
Annual charge
for interest, if
any.
In the case of Railways.
Passenger
Receipts.
Goods
Receipts.
Total Receipts.
Total Expenditure
(excluding any
charge for interest.)
Number of
Telegraph Messages
sent.
3$ miles open for mule traffic, remainder nothing done
Opened 16 ft. wide right through. Metalled at Lefkoniko partly foundationed.
Good for carriage Road foundationed and metalled. Partly Bridged.
All opened for carriage traffic to full width Srd class road included in Mamonia Valley
Road to Mandria.
6 miles Cart Road and 7 miles bridle road open.
14 ft. Carriage Road.
Bridle path open throughout for mule traffic.
Good Carriage Road. Foundationed throughout and metalled.
Good Carriage Road.
Good Carriage Road.
Opened Carriage Road, to Khalassa Bridge and thence to the 12th milestone on the
Troodos Road but not completed. A large Bridge built over Zighos River cost
£1,106 lis. Sep. in addition to cost of Road work and the Lophos Bridge widened to 16ft.
Open for carts throughout Lefka to Kalopanvoti 12 ft. wide. Thence connected with
Limassol District Roads at Prodromos by 3rd class cart road good in summer.
lnd;rdes soin.? lv
:
-lges and culvm-ts. 1| miles of 13 ft. branches to Agros and Kyperounda
included iu cost but nor. in distance given.
Opened L6ft. right through and bridged but unmetalled.
Opened for cart traffic right through 4th class Road.
Opened for cart traffic throughout, see Lefka—Prodromos Road.
£7,975
£4.034
64,734
£74
1,627
51 A