Page 398 - untitled

Basic HTML Version

395
ROADS and TELEGRAPHS.
i
j Annual charge
1
.
| for interest, it
!
I
»*-J-
1
1
In the case of Railways.
Passenger
Receipts.
Goods
Receipts.
Total Receipts.
Total Expenditure
(excluding any
charge for interest.)
N u m b e r ot
Telegraph Messages
sent.
i
! •
I
I
I
34* miles open for mule traffic, remainder nothing done
Opened 16 ft. wide right through. Metalled at Lefkoniko.
All opened for carriage traffic, 2-J miles full width road and £ mile 13 ft. wide.
All opened for camel traffic and 3-V miles full width road and 1£ 13 ft. wide included
in Mamonia Valley Road to Manclria.
6 miles Cart Road and 7 miles bridle road open.
14 ft. Carriage Road.
Bridle path open throughout for mule traffic.
Good Carriage Road. Foundationed throughout and metalled.
Good. Carriage Road.
Good Carriage Road.
Destined to become Carriage Road, but not completed. A large Bridge built over Zighos River
cost £1.1061 ls. Sep. in addition to cost of Road work and the Lophos Bridge widened to 16ft.
Lefk to Kalopanyoti—Mule traffic only.—Difficult places opened 12 ft. wide. Kalopanyoti
connected with Limassoi District Roads at Prodromos by 13 ft. cart road good in summer.
Includes some bridges and culverts. \\ miles of 13 ft. branches to Agros and Kyperounda
included in cost but not in distance given.
Opened 16ft. right through and bridged but unmetalled.
Opened for cart traffic for 4 miles 13 ft. wide.
None
£8,256
£75
£3,261
64,217
1,743
51
A