Page 393 - untitled

Basic HTML Version

38;
ROADS and TELEGRAPHS.
Annual charge
for interest, if
anv.
In the case of Railwavs.
Passenger
Receipts.
Goods
Receipts.
Total Receipu.
Total Expenditure
(excluding any
charge for interest.)
Number of
Telegraph iles.-ages
sent.
3£ miles open for mule traffic, remainder nothing done
Opened 16 ft. wide right through. Meralled at Lefkoniko.
All opened for camel traffic and 1-^ miles full width road and £ mile 13 ft. wide.
All opened for camel traffic and 3* miles full width road and IA; 13 ft. wide included
in Mamonia Valley Road to Mandria.
6 miles Cart Road and 7 miles bridle road open.
14 ft. Carriage Road.
Bridle path open throughout for mule traffic.
Good Carriao-e Road. Foundationed rhrou^hour and metalled.
Good Carriage Road.
Good Carriage Road.
Destined to become Carriage Road, not completed. A large Bridge built over Zighos River
cost £525 2s. Sep in addition to cost of Road work and the Lophos Bridge widened ro 16 ft.
Mule traffic—Difficult places opened 12 ft. wide.
Includes some bridges and culverts. 1*| miles of 13 ft. branches to Agros and Kyperounda
included in cost but not in distance given.
Opened 16ft right through and bridged but unmetalled.
Opened for cart traffic for 4 miles lot'r. wide.
None
£7,644
£3.216
60,613
£78
1,680
->0
A