RAILWAYS, CANALS,
Terminal Stations of each Line.
Whether con–
structed, owned.
or worked by
Government, or by
private body.
Length open for
traffic
RAILWAYS.—None.
CANALS (for traffic).—None.
ROADS & BRIDGES. Miles
Nicosia to Larnaca 26
New Entrance branch 2
Nicosia to Famagusta
,, „ Limassoi
>>
„ Kythrea
„ Peristerona
„ „ Kyrenia
Larnaca „ Mari River xii Zii
JJ
„ Famagusta
Central Mesaoria
Road
to Kophinou
Kophinou „ Lefkara
Kato Lefkara Branch Road
Khirokitia to Ora
Government
>>
- n
JJ
JJ
J>
JJ
JJ
JJ
it.
>i
' These figures include original cost and sums subsequently spent
Miles.
28 "
37
54
8
17
16
24
26
24
l*i
64
1:1
101
Gauge of Kailway
or
width of Canal.
Total
cost of construction
up to date.
«
w
S.
c.p.
21,164 14 0
8,345 3 3
9,738 2 5
3,965 14- 0
1,755 5 3
3,365 18. 1
6,060 0 4
1,138' 14 6
0,764 3 4
3,324 12 3
S4S 7 8
252 19 2
1.244 • 6 1
on maintenance, and construction of brM-