Page 459 - untitled

Basic HTML Version

RAILWAYS, CANALS,
Terminal Stations of each Line.
Whether con–
structed, owned.
or worked by
Government, or by
private body.
Length open for
traffic
RAILWAYS.—None.
CANALS (for traffic).—None.
ROADS & BRIDGES. Miles
Nicosia to Larnaca 26
New Entrance branch 2
Nicosia to Famagusta
,, „ Limassoi
>>
„ Kythrea
„ Peristerona
„ „ Kyrenia
Larnaca „ Mari River xii Zii
JJ
„ Famagusta
Central Mesaoria
Road
to Kophinou
Kophinou „ Lefkara
Kato Lefkara Branch Road
Khirokitia to Ora
Government
>>
- n
JJ
JJ
J>
JJ
JJ
JJ
it.
>i
' These figures include original cost and sums subsequently spent
Miles.
28 "
37
54
8
17
16
24
26
24
l*i
64
1:1
101
Gauge of Kailway
or
width of Canal.
Total
cost of construction
up to date.
«
w
S.
c.p.
21,164 14 0
8,345 3 3
9,738 2 5
3,965 14- 0
1,755 5 3
3,365 18. 1
6,060 0 4
1,138' 14 6
0,764 3 4
3,324 12 3
S4S 7 8
252 19 2
1.244 • 6 1
on maintenance, and construction of brM-